Thank you for visiting our site. If you are interested in supporting our students and research, please contact us.
Dates |
Student |
Degree Awarded |
Title/Topic |
As |
2010- |
Yuang Xu |
PhD |
Advanced HV Solid State Protection Devices |
MP |
2010- |
Haotao Ke |
PhD |
Advanced Energy Packaging Processes |
MP |
2010-2011 |
Kaushik Illa |
MS |
Investigation of Solid State Protection for Renewable Energy Systems |
MP |
2009-2011 |
Krishna Prasad Bhat |
MS |
Feasibility of High Power Equipment Protection with MEMS-Based Sensor Syst. |
MP |
2009-2011 |
Yuanbo Guo |
MS |
Development of a High Current High Temperature SiC MOSFET based Solid-State Power Controller |
MP |
2005-2011 |
Charles Shene |
MEng |
The Tri Lakes Static Var Compensator installations and operation |
MP |
2005-2011 |
Timothy Dzimian |
MEng |
Increasing Transmission Capacity with Composite Core Conductors |
MP |
2009-2011 |
Arunkumar Aravamudhan |
MS |
High temperature (>300C)device testing topics |
MP |
2009- |
Othman Elkhomri |
PhD |
Advanced Topologies and Control for Electronic Energy Processing Systems |
MP |
2008- |
Brian Chu |
MS |
TBD |
MP |
2007-2009 |
Minh Poirier (ENSEA) |
MS |
Autonomous Energy Management Device to Optimaly Allocate Power Applicable to The Land Warrior |
MP |
2005-2009 |
Ahmed Hosny |
PhD |
Using TSC for Alternative Energy Systems |
CM |
2007-2010 |
Yuan Ma |
PhD |
An Internet-based Sensor Network and its Application to Electric Field Sensing |
CM |
2006-2008 |
Michael A. Ayisi |
MEng |
Interconnection Of Wind Energy On Transmission System |
CM |
2006-2008 |
Michael Backus |
MEng |
Voltage Regulation And Paralleling Mismatched Transformers |
CM |
2008 |
Emily Ceccarelli |
MEng |
Three Phase Active Power Factor Correction Design For Military Application |
CM |
2006-2008 |
Srikanth Pothedar |
MS |
Investigation of the impact of Plug-in Hybrid Electric Vehicles on the Electrical Power Grid |
MP |
2006- |
Kevin Enser |
PhD |
High Frequency Effects on Electromigration in Solder Interconnects |
MP |
2004-2008 |
Mohamad Abdoulhamid |
PhD |
Investigation of Themomigration in Flip-Chip Solder Joints |
Co- |
2006-2007 |
Troy McKay |
MEng |
Investigation Of Thermal Impedance And Stress In Direct Attached Ceramic-Alsic Structures For Use In Power Packaging |
MP |
2002-2007 |
Chia K Leong |
PhD |
Improving Materials For Thermal Interface And Electrical Conduction By Using Carbon |
CM |
2005-2007 |
Emily Ames |
MEng |
Re-establishing Cathodic Protection on High Voltage Underground Pressure Fluid Filled Pipes Cables |
MP |
2005-2007 |
John Baudanza |
MEng |
Perform Underfrequency and Undervoltage Load Shed Analysis for Western Division |
MP |
2005-2007 |
Daniel Cammaratta |
MEng |
Perform Manual Load Shed Analysis for Western Division |
MP |
2005-2007 |
Mark Domino |
MEng |
Rebuilding the Buffalo 23 kV and 4.16 kV Systems to Meet Upcominng Load and Asset Replacement Strategies |
MP |
2005-2007 |
Leonard Fiume |
MEng |
Voltage Support and Power Flow Improvement on 115 kV System with Shutdown of Generation in the Tonawanda Area Load Pocket - Analysis of the Huntley Options 1A, 1B, 2A, 2B – Pat I |
MP |
2005-2007 |
William Flemming |
MEng |
Procedure Change and Evaluation for Line Personnel to Perform Work on Transmission Lines |
MP |
2005-2007 |
Jacky Fung |
MEng |
Understanding the Relationship between Power Generation and System Stability |
MP |
2005-2007 |
Brian Gordon |
MEng |
Reactive Reserves on the Transmission System |
MP |
2005-2007 |
Kenneth Hampton |
MEng |
Reactive Compensation on the Distribution System |
MP |
2005-2007 |
Jeffery Maher |
MEng |
Voltage Support and Power Flow Improvement on 115 kV System with Shutdown of Generation in the Tonawanda Area Load Pocket - Analysis of the Huntley Options 1A, 1B, 2A, 2B – Part III |
CM |
2005-present |
Glynn Matthews |
MEng |
Increasing Transmission Capacity with Composite Core Conductors |
CM |
2005-2007 |
Jon Moscovic |
MEng |
Comparative Analysis and Implementation of the S&C Tripsaver for Electrical Distribution System Protection |
CM |
2005-2007 |
Jeffrey Wagner |
MEng |
Perform Manual Load Shed Analysis for Western Division |
CM |
2005-2007 |
Davinah Walker |
MEng |
Comparative Analysis and Implementation of IntelliRupter PluseCloser for Electrical Distribution System Protection |
CM |
2005-2006 |
Henry Wysocki |
MEng |
unknown |
CM |
2005-2007 |
Robert Zahm |
MEng |
Voltage Support and Power Flow Improvement on 115 kV System with Shutdown of Generation in the Tonawanda Area Load Pocket - Analysis of the Huntley Options 1A, 1B, 2A, 2B – Part II |
CM |
2005-2007 |
James Zeames |
MEng |
Robert Moses Unit 8 Condition Monitoring |
CM |
2005-2007 |
Nakul Pandit |
MS |
Simulation and Control of Thyristor Controlled Series Capacitors |
CM |
2004-2008 |
Grzegorz Prusaczyk |
MEng |
Enhanced Substation Voltage Regulation; Hardware Installation and Testing |
MP |